Objectives:
Replace old fascias, guttering, and downpipes while maintaining the existing roof, framing, and soffits.
Solutions:
- Used an Elevated Work Platform (EWP) instead of scaffolding to allow common areas to remain open after hours.
- Installed replacement products matching the existing hydraulic capacity, achieving a 25-year warranty on the system.
Outcome:
Delivered a restored guttering and downpipe system with improved appearance, safety, and long-term durability.
Challenges:
- Ensuring access to common areas during works.
- Operating in a live environment with minimal disruption.
- Achieving a seamless integration with existing building elements.
Project Information
- Location: Oak Flats, NSW
- Value: $50,000
- Duration: 3 weeks

